Featured Links  

   
   

Model Railways

October 2018 Maintenance

It's some time since I ran any locos on this layout, and as such the track needed a clean.  As you can imagine the only way that I can clean inside the tunnel is to lift the top off.

 

The layout before I started.

 

 

The layout is made so that the top just lifts off as you can see here.

 

This is the top removed in the images below you can see the hooks that I use to lift it off, they are normally hidden from view.

 

Track checked and clean, the top is back in place and the hooks hidden again.

 

Real water flowing down the waterfall.

 

Along the river....

 

...and out of view under the railway bridge.

 

All back to normal again.

 

Published 01/10/2018

 

Please click totem to go 

   

 

   
© FGO